QC Mechanical/Piping/ HVAC inspector, QC Mechanical/Welding Engineer, QC Inspector Fixed equipment

Specializations:
  • Other

Employment: full time, project work

Work schedule: full day, rotation based work

Work experience 24 years 3 months

January 2021currently
3 years 4 months
NES Fircroft/ SGS LLP -Tengizchevroil FGP ORKEN Village

Atyrau

QC Mechanical/Piping Inspector OV
Monitoring the hydrotest of piping spools and pipelines on behalf of the Client. Visual inspection of welds and confirmation of welding reports ( WPS -CS,CS-SS, BPS-Cu) Welders qualification monitoring (WPS-CS,SS, SS-SC, BPS-Cu) Checking the documentation package (completeness) pipeline passports for turnover on behalf of the Client. Confirmation of radiography films interpretation and issue of conclusion on behalf of the Client. Checking and Confirmation Works on Flange Management& Bolt torqueing of flange joints. Checking and Confirmation Works Hydrotest, pneumatic test. Checking and confirmation of HVAC works. Inspections to check and confirm the Line Reinstatement of pipelines after testing. Inspections to check Final inspection and confirmation of the installation of pressure vessels, tanks and process units (PACKAGE UNIT). Inspections to check and confirm the Final Inspections to check and confirm the installation of rotating equipment (centrifugal, axial pumps)
July 2019currently
4 years 10 months
Fircroft -Tengizchevroil FGP RV Support Service
QC Inspector - Mechanical RV
• Attend as the Company nominated representative for Mechanical discipline witness and monitor intervention points on Site Construction ITPs, • Continuously monitor and where required carry out joint surveillance inspection with the Contractor’s on site QC Counterparts, • Review associated inspection records for completeness and accuracy, • Monitor Subcontractor’s manufacturing processes (including technicians and inspector qualifications, Contractor’s inspector input, implementation of agreed procedures and construction drawings, implementation of testing etc), • Monitor and ensure Contractor raises NCRs as and when non conformances are detected, • Investigate the root cause of any NCR’s raised and report outcome to the Lead Quality Engineer, • Monitor key testing and completeness of records (including NDT), and perform spot checks of associated records, • Oversee Contractor’s Weld / NDT Data Base • Periodic checks of Equipment Calibrations, • Periodically check equipment storage and preservation, • Participate in Company RFT program and monitoring of Contractor’s implementation, • Ensure discipline records are included for handover, including MDRs, and • Produce formal reports of inspection carried out on the construction site
July 2018May 2019
11 months
Tengizchevroil FGP (Kuryk Ersai Yard)

Tengizhchrvroil.com

QC specialist FRB (Fabrication Record Book)
• Ensure manufacturing records are produced in compliance with the project specifications and procedures. • Review Contractor Fabrication Record Book and Piping Test Pack compilation procedures • Liaise and support RA Department to ensure all regulatory documentation is developed • Ensure all Mechanical Completion certification is obtained at each fabrication location in line with Project schedules (McPlus/NEWS etc) • Ensure all required release certification is obtained prior to shipment • Provide input to and support the contractor in resolving problems in relation to manufacturing records • Monitor the compilation of certification and fabrication data books to ensure timely and accurate completion of records • Attend site meetings as required. • Perform site safety inspections as required and Support the TCO Site safety Representative with the sites efforts on HSE and IIF management by performing site safety inspections as required • Provide input to the punch listing of completed works. • Report to the Senior Quality Records Supervisor on any site or sub contractor problems.
December 2016July 2018
1 year 8 months
Fircroft-Tengizchevroil FGP (Kuryk Ersai Yard)

Aktau, Tengizhchrvroil.com

Construction, Real Estate, Architecture... Show more

QC Welding Inspector Structural
Monitoring welding works pipe racks metal structures. Physical inspection of the joints metal structures on the and monitoring of keeping records for the welding works. Monitoring NDT performance (MT,PT,HT) on the weld connections representing the Client. Confirmation of defect identification and monitoring the weld connection quality by holding MT,PT on behalf of the Client. Checking the documentation package (completeness); pipeline passports for turnover on behalf of the Client; Monitoring welder’s test Monitoring of welding procedure certification process Holding of materials receiving inspection on behalf of the Client and its turnover to Contractor for pipe racks metal stuctural installation. Weld joints quality control had been done in accordance with international standards, Construction norms and rules SNiP Rok 5.04 –Quality Control Procedures AWS D1.1 -1.6, IX ASME
November 2014November 2016
2 years 1 month
Fircroft-Tengizchevroil (Project WHU)

Atyrau, Tengizhchrvroil.com

Oil and Gas... Show more

QC Piping/mechanical equipment Inspector
Checking the pipelines installation as per test plans. Monitoring welding works on the pipelines and metal structures. Physical inspection of the joints on the pipelines 3/4"-14" and monitoring of keeping records for the welding works. Monitoring NDT performance (RT,MPI,PT,HT and PWHT) on the weld connections representing the Client. Confirmation of defect identification and monitoring the weld connection quality by holding RT,MPI,PT,HT on behalf of the Client. Confirmation of radiography films interpretation and issue of conclusion on behalf of the Client. Checking the documentation package (completeness); pipeline passports for turnover on behalf of the Client; Monitoring welder’s test Checking the pipelines installation as per test plans. Monitoring of welding procedure certification process Monitoring the hydrotest of piping spools and pipelines on behalf of the Client. Monitoring the performance of golden welds on the existing lines on behalf of the Client. Holding of materials receiving inspection on behalf of the Client and its turnover to Contractor for pipelines installation. Weld joints quality control had been done in accordance with international standards, Construction norms and rules SNiP Rok 5.04 –Quality Control Procedures ASME 5, ASME 8, ASME 9, API 1104, ASME В 31.3, AWS D1.1 -1.6. Control over proper performance of pipeline installation, equipment installation – water pumps; overhead crane installation by the Contractor. Control over proper performance of equipment preservation – water pumps, overhead crane.
February 2013November 2014
1 year 10 months
Fircroft-Tengizchevroil- Project WISU( Water Injection System Upgrade)

Atyrau, Tengizhchrvroil.com

Oil and Gas... Show more

QC Piping/mechanical equipment Inspector
Checking the pipelines installation as per test plans. Monitoring of welding procedure certification process Monitoring welding works on the pipelines and metal structures. Physical inspection of the joints on the pipelines 2",6",8",10",12,14 and monitoring of keeping records for the welding works. Monitoring NDT performance (RT,MPI,PT,HT and PWHT) on the weld connections representing the Client. Confirmation of defect identification and monitoring the weld connection quality by holding RT,MPI,PT,HT on behalf of the Client. Confirmation of radiography films interpretation and issue of conclusion on behalf of the Client. Checking the documentation package (completeness); pipeline passports for turnover on behalf of the Client; Monitoring the hydrotest of piping spools and pipelines on behalf of the Client. Monitoring the performance of golden welds on the existing lines on behalf of the Client. Holding of materials receiving inspection on behalf of the Client and its turnover to Contractor for pipelines installation. Weld joints quality control had been done in accordance with international standards, Construction norms and rules SNiP Rok 5.04 –Quality Control Procedures AWS D1.1 -1.6,ASME 5, ASME 8, ASME 9, ASME В 31.3,API-1104 Control over proper performance of pipeline installation, equipment installation – water pumps; overhead crane installation by the Contractor. Control over proper performance of equipment preservation – water pumps, overhead crane.
June 2012January 2013
8 months
LLP “SAEM- CENTER”, Temirtau city

Temirtau

Construction, Real Estate, Architecture... Show more

2nd category NDE Inspector with the right to issue conclusions. 2nd category Welding Works Inspector
• Welders qualification monitoring • Welding performance monitoring • Welds visual inspection and welding activities reports preparation • Welds NDE and hardness tests performance monitoring • Welded joints defects detection and quality control by RT • Radiographs interpretation and conclusions preparation • Welding logs review and timely preparation • Units handover documentation preparation
August 2008December 2011
3 years 5 months
Aker Solutions Contracting Kazakhstan

Atyrau

Construction, Real Estate, Architecture... Show more

QA/QC Engineer (Welding works documentation)
1.Preparation, compiling of the welding works turnover and NDT documentation. 2.Preparation of hidden works acceptance acts – pipelines, steel structures as per RK SNiP – RoK SNiP 1.03.06-2002 Enclosure “G”. 3.Preparation of acceptance act for steelwork (systems) erected while construction – pipelines, steel strucutures as per RK SNiP – RoK SNiP 1.03.06-2002 Enclosure “D”. 4.Preparation of the process pipelines testing acts as per VSN 478-86, form 4 for customer Agip KCO company, State Committee (GGTN, Marine Inspection, Department of Emergency Situations) in compliance with RoK regulations (SNiP, VSN).
September 2006August 2008
2 years
LLP “Montazhspetsstroy” (MSS)

Atyrau

Construction, Real Estate, Architecture... Show more

NDT and Welding Works Engineer
Quality control of welds while constructing 6000m3 - 80000m3 tanks and pipelines from 2'' up to 24'' in diameter. Nondestructive testing types: VI, PT, RT, MT. Preparation of turnover documentation and submission to Customer- Agip KCO. Evaluation NDT was performed as per international standards, RK SNiP 5.04, QA/QC procedures: ASME 5, ASME 8, ASME 9, ASME B 31.3, API- 650. Responsibilities: • Control of tanks erection compliance with plans of inspections and tests (PIT) • Welders qualification monitoring • Welding performance monitoring • Welds visual inspection and welding activities reports preparation • Welds NDE and hardness tests performance monitoring • NDE inspectors work management • NDE inspectors work coordination • Welded joints defects detection and quality control by RT • Radiographs interpretation and conclusions preparation • Tank hydrotesting performance monitoring • Welding logs review and timely preparation • Units handover documentation preparation
January 2005January 2006
1 year 1 month
LLP “Imstalcon-Temirtau ”

Atyrau

Construction, Real Estate, Architecture... Show more

2nd category NDE Inspector with the right to issue conclusions.
Welded joints quality control during JSC “Mittal Steel” steel continuous casting shop construction. Quality control of welded joints during crude oil tanks major repair in Karazhambas settlement, Mangystauskaya oblast. 100% and sport radiography performance of vertical and horizontal welded joints at 1,2,3 layers of crude oil tanks with volume 20000m3. Spot radiography of 76,159,216 mm pipe welded joints at fire foam system. Issue of QC conclusions to Customer. Executed works scope in amount of 1000 films. Visual inspection of all welded joints during performance of the tanks major repair. Corner and butt welds 100% vacuum tests for replaced bottom with following conclusions issue. Welded joints quality control during Crude Oil Tanks construction at Karabatan station, Kashagan field development. Position of Quality Control Engineer in JS Company “Montazhspetsstroy”. Design documentation preparation for Customer- Agip KCO. Welded joints quality control during 80000m3 Crude Oil Tanks construction for Contractor- JSC “Koksohimmontazh- Asia”. Visual inspection of all 80000m3 Crude Oil Tanks and 6000m3 Technical Water Tank welded joints during construction. 1-8 layers, annular ring vertical and horizontal welded joints 100% and spot radiography performance. Floating roof upper and lower decks, bottom welded joints vacuum test during tank construction. Temporary tacking welds, corner weld, welded joints dye penetrant inspection. All Control types were performed by Almaty Welding Laboratory NDE Inspectors under my management with the following technical documentation issue- Check lists, Tank welded joints quality conclusion to Contractor- JS Company MSS “Montazhspetsstroy” and to Customer Agip KCO. Work with technical documentation, drawings that were submitted by Client. Welded joints quality control was performed in accordance with international standards- ASME 5, ASME 8, ASME 9, ASME B 31.3, API- 650. Responsibilities: • Welders qualification performance • Welding procedures qualification performance • Welds visual inspection and welding activities reports preparation • Welds NDE and hardness tests performance monitoring • NDE inspectors work management • NDE inspectors work coordination • Welded joints defects detection and quality control by RT • Radiographs interpretation and conclusions preparation • Units handover documentation preparation • Welding logs review and timely preparation
January 1999December 2004
6 years
LLP "Gas treating“/ GAZOOCHISTKA

Temirtau

Metallurgical equipment maintenance Engineer
Major and current repairs control and performance in JSC “Mitall Steel” TPP PVS, TPP-2. Work with technical documentation, drawings for boilers major repairs. Planning and economic documents, cost sheets, forms, requirements making and preparation. Major repairs performance preparation, origination and control as Area Superintendent. Power- generating equipment major repair and replacement: boilers, air heaters boilers, emulsifying agents, “Venturi” pipes, economizers, slide valves, technical water chemical treatment filters. Following handover of objects to shop technical personnel.

Key skills

You can change skill levels in the mobile app — the website will have this feature a little later on

Workability

Driving experience

Own car

Driver's license category B, C

About me

Self-correct decisions in a short time. Working in a team and individually.

Higher education

1994
Karaganda Metallurgical Institute, Temirtau “Metallurgical machinery and equipment” faculty
Mechanical engineer
1990
Temirtau Construction Technical College “Vehicles maintenance” faculty
Technician-mechanic

Languages

RussianNative


EnglishB2 — Upper Intermediate


Professional development, courses

2026
Welding engineering 3nd category specialist certificate (NACWP)
LLP “Imstalcon”
2026
2nd category NDT Inspector certificate СТ РК ISO 9712-2014
LLP “Imstalcon”
2019
APEC Petro Technic
Halliburton, Certificate Bolt Flange Joint Assembly- Manual and Hydraulic Tightening.
2010
Supervisory Courses Certificate
Aker Solutions Contracting -LLP YKK
2010
PTW courses certificate
Aker Solutions Contracting -LLP YKK
2010
HSE Agip Employee Passport
Aker Solutions Contracting -LLP YKK
2008
Sertificate Mister Doors
Aker Solutions Contracting -LLP YKK

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan, Russia

Desired travel time to work: Doesn't matter