Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Male, 72 years, born on 5 June 1951

Uralsk, willing to relocate (Uralsk, Bautino, Konayev, Shymkent, Kyzylorda, Belarus, Russia, Karaganda, Aksay (Kazakhstan), Aktau, Atyrau, Aktobe, Temirtau, Astana), prepared for business trips

Project Management Specialist (Planning, Monitoring etc)

1  in hand

Specializations:
  • Sales manager, account manager

Employment: project work

Work schedule: shift schedule

Work experience 29 years 7 months

June 2010May 2011
1 year
Karachaganak Petroleum Operating bv (KPO bv), IT&T Dept. Aksay, West Kazakhstan region
Project Management Consultant
Main Task: Creation of a Project Management System within IT&T Dept according to PMI Standards requirements. Performed work: - Revision of the existing PM System - Development of Workflows - Reissue of the Internal PM Standard, Procedures & Templates - Creation of a Demand Management Procedure Final achievement: the required PM System within IT&T Dept has been created
March 2008February 2009
1 year
DIETSMAN SpA Kazakhstan Branch, Aksay, West Kazakhstan region. Design activities for Oil&Gas Industry - KPO bv (Karachaganak field).
Planning engineer
Duties: Provision of planning and monitoring of design activities. Functions: 1. Projects planning: developing of WBS, Projects plan etc; 2. Projects scheduling (creation & updating a Projects's Schedule Plan according to WBS (Planning & Actual), S-Curve Diagram (Planning & Actual) etc.); 3. Work progress monitoring (creation & updating weekly/monthly Project Status report); 4. Tracking and analyzing of current situation and tendencies on execution of design works. Development of measures for elimination of negative tendencies; 5. Participation in preparation of Quotations. Creation of preliminary WBS, schedules etc; Achievements: 1. The conception of computerized monitoring system is created. Within this conception have been realized following possibilities: • Electronic forms (spreadsheets, diagram, schedules etc.) for monitoring of processes of design documents preparation has been developed. • Interactive models “Customer-Project manager-Project Administrator-Customer” as well as “Project managers-Project Administrators-Project Groups” has been developed» 2. The system of projects monitoring has been organized according to aforecited requirements. On the basis of information of the Progress Monitoring System is carrying out the analysis of work execution progress. In case of schedule’s risk will taken the measures on prevention of such incidents. 3. Generalized analysis of own activity has been provided
July 2004May 2007
2 years 11 months
“Algorithm” Technopark” LLP, Uralsk
Manager of the Training centre
Duties: The management of the training activities; A “Bases of the Projects Management” and " Bases of the MS Project 2003" courses - trainer
July 2002April 2004
1 year 10 months
“NIPIneftegas” CJSC (design activities for the Oil and Gas Industry), Uralsk branch. Customers - PFD, TCO ("Tengis" field), KPO bv (Karachaganak field) & other
Chief Specialist - Head of a Projects Management Group;
1. Regarding Project Management my duties and functions has been the same of the item DIETSMAN. Achievements also are identical: the efficient system of project monitoring has been developed and created. The system includes all above stated opportunities. 2. In addition I was engaged with Quotations preparation, Contracts preparation and Contracts management (in particular – Payment control). ities.
April 2000June 2002
2 years 3 months
“INTEK” LLP. Uralsk, engineering company. Customers - KPO bv (Karachaganak field), Renco, Tecnomare & other
Manager – Projects Co-ordinator
INTEC had been participated in construction of a Karachaganak Pilot Camp. Contractors list: Renco - General Contractor. Responsibilities: General Management, General designing INTEC - Contractor. Responsibilities: Detail designing; Subcontractors activities coordination Zenit - Subcontractor. Responsibilities: Steel constructions production ZhK - Subcontractor. Responsibilities: Steel constructions erection; HVAC & drain systems facilities construction, etc My responsibilities: 1. As a representative of the INTEC Co I was engaging with Quality assurance of a Welding processes on the “Zenit” plant 2. As a representative of the INTEC Co on the site (Karachaganak field) I provided Schedule tracking for: - Steel constructions erection processes - Excavation, Reinforcement & Concreting processes - Pipelining processes 3. Coordination of activities between Renco-INTEC, INTEC-Subcontractors
January 1992October 1998
6 years 10 months
"Kazakhfas" National State Holding Co.
Head of an IT Dept
Implementation of a new IT services to branch enterprises (gas compressor stations within all Kazakhstan's pipelines, gas underground storages etc)
April 1978December 1991
13 years 9 months
Computing Centers
From Programmer till Chief of a Computing Center
Software development Programmers team' leading Computing Center' management

About me

Computer Skills: MS Excel - excellent. Free using of all tools and possibilities of Excel including formulas, functions, macroses etc. MS Word - excellent. MS Project 2003 - good knowledge. Primavera Project Plan - a basic knowledge. "Projects Management" as per PMI standards (ANSI/PMBOK Guide 3-rd Edition) - good knowledge. ISO 9000:2000 - Basic knowledge. ISO 9001:2008 - Basic requirements knowledge. Knowledge of an Information Technologies. Till 1991 I worked as a computer programming engineer, a lead software engineer, a deputy director of a Computing Centre and a chief of the Computing Centre. In 1992 - 1998 I worked as the chief of an IT department of the "Kazakhgas" State Holding company . Since 2000 I concern of the Projects Management, the Planning and Monitoring matters.

Portfolio

Higher education

1978
Leningrad Polytechnic Institute, St. Petersburg, Russia;
Department of Physics & Mathematics; “Applied Mathematics” specialty; , "Mathematician Engineer" qualification;

Languages

KazakhNative


EnglishC1 — Advanced


RussianC2 — Proficiency


Professional development, courses

2006
«4009 Setting Up Projects for Success Using Microsoft Office Project 2003»;
the Microsoft Technical Education Center, Prague;, Certificate;
2006
“Project Management in MS Project Professional 2003”;
the Computer Training Center at Bauman Moscow Technical University, Moscow;, Certificate;
2005
“Project Management by PMBOK Guide 3-rd Edition”;
the “Project Bureau” Co, Moscow;, Certificate;
2005
“ANSI PMI PMBOK Guide 2000”;
the PMI St. Petersburg Chapter;, Certificate;
1992
“Western Management Practices in Oil & Gas Industry”;
Training Center’s: "Templeton College" (Oxford, England); AGIP (Milan, Italy); ENI (Rome, Italy), 1992; , Certificate;

Tests, examinations

2009
"English" testing
KPO bv, The "Intermediate" level has been fixed

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter